The following work will be performed next week from January 6, 2020, through January 10, 2020:

  • Saw cutting and sealing of new concrete 
  • Installation of steel beam under the sidewalk at 114 Boylston Street
  • Caulking in front of 80 and 116 Boylston Street 
  • Removal of temporary metal ramp at 80 Boylston Street